PESCO Demand Notice Fee 2025

PESCO New Connection Fee 2025 – Demand Notice [Full Details]

When we want a new electricity connection we request a new electricity meter connection in WAPDA/ PESCO. The PESCO Demand notice (charge) a fee every other time a connection is made and this is referred as the demand notice fee. This blog is about paying and fees demanded through notice in 2025. Online downloading, printing and monitoring of demand notice will also be discussed.

PESCO Demand Notice Categories & Fee Structure 2025 – Complete Guide

Below are some common types of meter connections along with their applicable fees.

1. PESCO Demand Notice Fee 2025 for Domestic Single-Phase Connections


The most frequent connection is a single-phase household connection. This is necessary for residential electricity use. PESCO levies fees based on geography (varying rates in 2025 for rural and urban areas). Also, in metropolitan locations, housing societies may have distinct fee systems than local communities;

●       Single-Phase Demand Notice Fee (Rural): PKR [ 8,000 ]

●       Single-Phase Demand Notice Fee (Urban): PKR [12,000]

●       Single-Phase Demand Notice Fee (Urban Areas in Private Colonies): [PKR 16,000]

2. PESCO Commercial Single-Phase Connection Fee 2025 – Updated Rates

PESCO provides commercial single-phase connections to stores and small enterprises.  The demand notice charge for this connection is PKR 23,000.

3. 2025 Domestic 3-Phase Demand Notice Charges – PESCO Fee Structure

WAPDA has changed its policy. A three-phase connection is now required for properties greater than 5 Marla. This applies to any new household connections. The PESCO demand notice cost for a three-phase connection is between PKR 95,000 and 105,000.

4. Three-phase commercial demand notice fee 2025

A new three-phase connection in the PESCO area costs between PKR 100,000 and 135,000 as a demand notice charge.  This price may vary according to location and load.  For further information, see the New Connection page.  You can also call the PESCO Helpline for the most recent information.

5. Three-Phase Agricultural Tubewell Fee – PESCO Demand Notice Details 2025

An agricultural tubewell connection requires a much higher demand notice fee.  This is because it needs more infrastructure.  The setup consists of electrical poles, transformers, and wire.  It also features a three-phase meter.

 The anticipated cost is between PKR 500,000 and 1,000,000.  It depends on the area and installation needs.

 For specific information, visit the PESCO office or call the PESCO Helpline.

6. Industrial and Societies Connection Fees

PESCO determines the demand notice fees (updated 2025) for industrial/housing society connections.  These fees are set by senior management.  The quantity is not set.  It varies depending on the location, infrastructural requirements, and connection type.

Check and Print PESCO Demand Notice Online

First, apply for a new connection and follow the necessary procedures for 2025.  Following that, PESCO will handle your request.  When the demand notice is completed, a staff member will notify you.  You will be contacted by phone or text message for printing and payment information.

Steps to Check and Print Your Demand Notice Online:

1. Go to the ENC website (Electricity New Connection Portal).

 2. From the homepage, select “Print DN (Demand Notice)”.

 3. Enter your CNIC number into the necessary space.

 4. Download and print the demand notice for payment processing.

Tip: Remember to pay the demand notice cost before the due date.  This will allow you to prevent delays in your new connection procedure in 2025.

Demand Notice Validity and Payment Procedure

Validity Period:
Once issued, your PESCO demand notice is valid for one month in 2025.  You must pay it within this timeframe.  If not, you may need to reapply for a fresh demand notice.

Payment Method: The demand notice fee may only be paid at approved bank branches, including UBL (United Bank Limited), ABL (Allied Bank Limited), Habib Bank Limited, and other allocated commercial bank branches.

Important: Always double-check the bank details on your demand notice.  This helps to prevent any payment difficulties.

PESCO Demand Notice Tracking Online

After you pay your PESCO demand notice, you may check the status of your new connection.  You may also check the remaining days online.  Simply go to the official ENC (Electricity New Connection) website and follow the procedures.

 Step 1: Open the official website, enc.com.pk.

 Step 2: Click the “Track” button in the left corner.

  Step 3: Select your firm as PESCO.

  Step 4: Enter your Reference or CNIC number. Step 5: Click Submit to get your new connection details and monitor remaining processing days.

 Make sure you type the proper information.  This will allow you to prevent tracking mistakes.

 Check your PESCO bill online, click here.

PESCO Demand Notice – Frequently Asked Questions (FAQs)

How can I check a demand notice online?

You may view your PESCO demand notice online.  Visit the ENC’s official website, enc.com.pk.  Select the ‘Print Demand Notice’ option.  Then, enter your CNIC or reference number to get your demand notice.

How can I follow the WAPDA demand notice online?

For WAPDA demand notice tracking, visit enc.com.pk.  Select the ‘Track’ option.  Choose PESCO from the list.  Enter your reference number or CNIC to verify the status of your demand notice.

How can I print my PESCO’s new connection demand notice?

To print your PESCO demand notice, visit enc.com.pk. Choose the ‘Print DN’ option. Please enter your CNIC or reference number. Then, download the PDF file for printing.

What is the validity time for a PESCO demand notice?

The demand notice is valid for 30 days from the date of issue. You must pay it within this timeframe. If not, you will have to apply for a fresh demand notice.

 

Similar Posts